Changes between Version 8 and Version 9 of access/UmTechnicalInfrastructureProjectAug15Highlights


Ignore:
Timestamp:
Sep 1, 2015 4:08:43 PM (5 years ago)
Author:
Michael Naughton
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • access/UmTechnicalInfrastructureProjectAug15Highlights

    v8 v9  
    77= Progress Notes for Jun-Aug 2015 Highlight Reports
    88
    9 === TIAG: Advisory Group
     9=== TIAG: Advisory Group (Michael Naughton)
    1010
    1111 * Michael Naughton, Martin Dix, Tony Hirst, Ben Evans travelled to UM Users Workshop.
     
    1818 * Michael Naughton arranged 31-Aug meeting re Bureau UMTIP progress
    1919
    20 === TISD: Suite Design
     20=== TISD: Suite Design (Yi Xiao)
    2121
    2222 * Yi Xiao has been nominated as Bureau contact for TISD work package.
     
    2828   * DA aspects have been difficult to progress because of several months delays in Met Office providing OPS/VAR vn31/32 versions.
    2929
    30 === TICT: UM Configuration Testing
     30=== TICT: UM Configuration Testing (Michael Naughton)
    3131
    3232 * Michael Naughton, Martin Dix and Scott Wales participated in 23-Jul Checkpoint Meeting.
     
    3737 * Ilia Bermous has exchanged email messages with Stuart Whitehouse regarding possibility of parallelising CreateBC, as he has previously done for MakeBC.
    3838
    39 === TIHP: High Performance Optimisation and Benchmarking
     39=== TIHP: High Performance Optimisation and Benchmarking (Ben Evans)
    4040 
    4141 * Ben Evans and Paul Selwood have been nominated as TIHP work pacakage leads.
     
    4646 * Ilia Bermous visit has been arranged for September.
    4747
    48 === TIDA: Data Assimilation
     48=== TIDA: Data Assimilation (Peter Steinle)
    4949
    5050 * ''Peter Steinle to add progress items here
    5151
    52 === TISU: Small Utilities
     52=== TISU: Small Utilities (Lawrie Rikus)
    5353
    5454 * ''Lawrie Rikus to add progress items here