Changes between Version 97 and Version 98 of access/UmPartnersTechnicalInfrastructureProject


Ignore:
Timestamp:
Feb 21, 2019 6:48:03 PM (3 months ago)
Author:
Michael Naughton
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • access/UmPartnersTechnicalInfrastructureProject

    v97 v98  
    11[[PageOutline]]
    22
    3 = UM Consortium Technical Infrastructure Collaboration Project =
     3= UM Consortium Technical Infrastructure Collaboration Project
    44
    55== Revision status
     6
     7 * [Michael Naughton 21/02/2019] '''Update:''' A number of key BoM managers and staff have been consulted.  This submission has been verbally endorsed by Tony Hirst, as Science to Services (STS) Earth System Modelling (ESM) Research Program Leader, in preparation for March UMPB Meeting.
    68
    79 * [Michael Naughton 18/02/2019] '''Work in progress:''' This page has been updated with draft version of BoM 2019-20 plans.  These plans are being provided to UMTIP Project Manager and BoM staff to review their sections, and make changes as required.  Information below is subject to change.  This update is for Bureau parts only; CSIRO contributions have been preserved unchanged, moved into separate section from BoM contributions.
     
    5355 * WP leads: Michael Naughton, Richard Glover
    5456 * BoM contacts and contributors: Michael Naughton, Ilia Bermous, Lawrie Rikus, Milton Woods and others
    55  * Ilia work on UM optimisation
    56  * Possible work on updating UM builds to all-in-one versions
    57  * Possible work on regular BoM Rose-stem testing for UM/OPS/VAR
    58  * Possible work on STASH
     57 * Ilia work on UM optimisation (CD/LI)
     58   * Expect to continue to contribute optimisation mods to UM release versions (CD)
     59 * Possible work on updating UM builds to all-in-one versions (CD)
     60 * Possible work on regular BoM Rose-stem testing for UM/OPS/VAR (CD/LI)
     61 * Possible work on STASH (CD/LI)
     62 * Includes High Performance Optimisation and Benchmarking work previously recorded under TIHP work package (ref. [https://code.metoffice.gov.uk/trac/TI/wiki/TIHP MOSRS TIHP link])
    5963 * BoM FTE's: BoM 0.3 (CD: 0.2, LI: 0.1)
    6064   * CD: Contributions as per list. (0.2)
     
    6973 * WP leads: Peter Steinle, Adam Maycock
    7074 * BoM points of contact and contributors: Andy Smith, Peter Steinle, Fiona Smith, Tan Le et al.
    71  * Andy Smith work on observations processing and monitoring
    72  * Fiona Smith et al. work on DA control files
    73  * Peter Steinle, Jin Lee, Monika Krysta, Susan Rennie participate in RMED DA WG activities
     75 * Andy Smith work on observations processing and monitoring (CD/LI)
     76 * Fiona Smith et al. work on DA control files (CD/LI)
     77 * Peter Steinle, Jin Lee, Monika Krysta, Susan Rennie participate in RMED DA WG activities (CD/LI)
    7478 * BoM points of contact and contributors: Andy Smith (0.8), Peter Steinle (0.1), Tan Le (0.2)
    7579 * BoM FTE's: 1.1 (CD: 0.9, LI: 0.2)
     
    8286 * WP leads: Douglas Boyd, Fiona Smith
    8387 * BoM points of contact and contributors: Fiona Smith, Yi Xiao, Michael Naughton, Peter Steinle, Jin Lee, Susan Rennie, Shaun Cooper
    84  * Collaborate on design, implementation and testing of shared portable versions of the main global and regional NWP and Seasonal Prediction suites.
    85  * Take lead role in design and implementation of task-by-task documentation for suites.
     88 * Collaborate on design, implementation and testing of shared portable versions of the main global and regional NWP and Seasonal Prediction suites. (CD/LI)
     89 * Take lead role in design and implementation of task-by-task documentation for suites. (CD/LI)
    8690 * BOM FTE's: BoM 0.4 (CD: 0.2, LI: 0.2)
    8791   * CD: Contributions as per list. (0.2)
     
    96100 * BoM to collaborate and contribute to Rose and Cylc. 
    97101 * BoM-Altair Cylc Project possible contributions:
    98    * Funding Hilary Oliver development work through Altair contract
     102   * Funding Hilary Oliver development work through Altair contract (CD)
    99103   * Message broker development
    100104   * Dashboard and reporting functionality
    101105   * Rose and Cylc security evaluation and hardening
    102106   * Enterprise Rose-Cylc support developments
    103    * BoM Cylc developer involvement in Cylc development
     107   * BoM Cylc developer involvement in Cylc development (CD)
    104108 * BOM FTE's: BoM 1.3 (CD: 0.8, LI: 0.5)
    105109   * CD: Contributions as per list. (0.8)
     
    127131 * CLEX contacts and contributors: Scott Wales
    128132
    129 === TIHP: High Performance Optimisation and Benchmarking
    130 
    131  * [https://code.metoffice.gov.uk/trac/TI/wiki/TIHP MOSRS TIHP link]; See also [https://code.metoffice.gov.uk/trac/TI/wiki/TICT MOSRS TICT WP].
    132  * WP leads: Ben Evans (NCI), Paul Selwood
    133  * BoM contacts and contributors: Ilia Bermous, Milton Woods, Justin Freeman.
    134  * NCI contacts and contributors: Ben Evans, Dale Roberts, Rui Yang (ACCESS-Opt project).
    135  * Now covered within TICT work package above.
    136  * BoM FTE's: BoM 0.0
    137133
    138134=== TIPP: IMPROVER -- NWP probabilistic post-processing and supporting verification
     
    182178
    183179 * WP lead: Chun-Hsu Su
    184  * ACCESS contacts and contributors: Peter Steinle, Greg Kociuba, Nathan Eizenberg
     180 * ACCESS contacts and contributors: Nathan Eizenberg, Peter Steinle
    185181 * BoM FTE's: 0.2 (CD: 0.1; LI: 0.1)
    186182   * BARRA Bureau Australian Region Reanalysis project.
    187183   * Reanalysis production run over the Australian domain for period 2000-2016, and report regional evaluation results for comparisons with other regional reanalysis projects.
    188    * BoM and NIWA have joint interest, iother UM Partners may also have interest, benefit from this activity.
    189 
    190 === TIOP: Operational Systems
    191 
    192  * WP lead: Tennessee Leeuwenburg
    193  * BoM Cylc project contact and contributors: Alan Riley, Damian Agius, Hilary Oliver (NIWA)
    194  * This nominal project was proposed to capture BoM activities to for Cylc assurance and enhancements for BoM operational requirements.  This will now be better to communicate through TIRS project. 
    195  * BoM FTE's: 0.0
     184   * BoM and NIWA have joint interest, other UM Partners may also have interest, benefit from this activity.
    196185
    197186=== TIAV: Data processing and visualisation