Changes between Version 96 and Version 97 of access/UmPartnersTechnicalInfrastructureProject


Ignore:
Timestamp:
Feb 19, 2019 5:06:22 PM (6 months ago)
Author:
Michael Naughton
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • access/UmPartnersTechnicalInfrastructureProject

    v96 v97  
    1313Participation of core members (UK Met Office, Bureau-CSIRO, KMA, NCMRWF and NIWA) is part of the UM Licence Agreement.  Under the terms of the UM Licence Agreement, the UM core partners have each agreed to 4 Full Time Equivalent (FTE) staff commitment to this programme.  In the ACCESS case, the commitment is 2 FTEs each for BoM and CSIRO.  The ARCCSS/CLEX is not required to have a formal resource commitment to the partnership, but they are also involved in the project as an UM associate member.
    1414
    15 '''Bureau planned 2019-20 activities are provided below.  As far as possible, these contributions have been discussed and agreed with relevant managers in each of the work areas.
    16 CSIRO planned activities are also provided, consistent with CSIRO internal project planning.'''
     15'''Bureau planned 2019-20 activities are provided below.  As far as possible, these contributions have been discussed and agreed with relevant managers in each of the work areas.'''
    1716
    1817== BoM 2019-2020 contributions ==
     
    6160   * CD: Contributions as per list. (0.2)
    6261   * LI: Keep up with cycle of UM releases. (0.1)
    63    * Note that Bureau UM optimisation work is recorded in the [wiki:UmPartnersTechnicalInfrastructureProject#TIHP:HighPerformanceOptimisationandBenchmarkingUPDATEDTIHP TIHP] work package below.
    6462 * CSIRO contacts and contributors: Martin Dix
    6563 * CLEX contacts and contributors: Scott Wales
     
    6967
    7068 * [https://code.metoffice.gov.uk/trac/TI/wiki/TIDA MOSRS TIDA link]
    71  * WP leads: Peter Steinle, Adam Maycock
    7269 * WP leads: Peter Steinle, Adam Maycock
    7370 * BoM points of contact and contributors: Andy Smith, Peter Steinle, Fiona Smith, Tan Le et al.
     
    8683 * BoM points of contact and contributors: Fiona Smith, Yi Xiao, Michael Naughton, Peter Steinle, Jin Lee, Susan Rennie, Shaun Cooper
    8784 * Collaborate on design, implementation and testing of shared portable versions of the main global and regional NWP and Seasonal Prediction suites.
    88  * Take lead role in design and implementation of task-by-task documentation for suites
     85 * Take lead role in design and implementation of task-by-task documentation for suites.
    8986 * BOM FTE's: BoM 0.4 (CD: 0.2, LI: 0.2)
    9087   * CD: Contributions as per list. (0.2)