Changes between Version 93 and Version 94 of access/UmPartnersTechnicalInfrastructureProject


Ignore:
Timestamp:
Feb 18, 2019 7:05:02 PM (10 months ago)
Author:
Michael Naughton
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • access/UmPartnersTechnicalInfrastructureProject

    v93 v94  
    164164   * LI
    165165 
    166 === Inactive or other work packages
     166=== Inactive and other work packages
    167167
    168168These may not currently exist as official TI projects.
     
    171171
    172172 * [https://code.metoffice.gov.uk/trac/TI/wiki/TIVE MOSRS TIVE link]
    173  * WP leads: Adam Clayton, Phil Gill
     173 * WP leads: Phil Gill
    174174 * BoM contacts: Chris Bridge, Vinod Kumar, Jin Lee
    175175 * BoM FTE's: 0.2 (CD: 0.0; LI: 0.2)
     
    203203 * BoM FTE's: 0.0
    204204
    205 
    206 
    207    * CD: Bureau to take lead on security enhancement of UM TI components. (0.1)
    208    * CD: Bureau to participate in discussions and meetings on operational technical infratructure aspects. (0.1)
    209    * Tennessee Leeuwenburg and other ISS experts will be involved in this area, which follows on from visits and contacts since 2015.
    210    * Tennessee Leeuwenburg presented on this work package at 2017 UM Users Workshop TI session.
    211    * Bureau has contract with Altair to provide supported Cylc version for Bureau operational and research requirements.  Relevant outcomes from this project will be shared with UM Partnership through TISD Suite Design work package.  Primary focus is security assurance; development of enhanced capabilities for monitoring and alerting, and generation of reports are also part of this project.
    212      * [https://accessdev.nci.org.au/trac/attachment/wiki/access/UmPartnersTechnicalInfrastructureProject/Cylc%20Roadmap%20Timeline%20v1.2.pdf BoM Cylc Project -- Roadmap]
    213      * [https://accessdev.nci.org.au/trac/attachment/wiki/access/UmPartnersTechnicalInfrastructureProject/Project%20Brief%20-%20SMS%20Replacement%20Project%20v0%205.docx BoM Cylc Project -- Project Brief]
    214    * Alan Riley is Bureau Project Manager of Cylc Project; Damian Agius is lead programmer for operational Cylc deployment; Hilary Oliver is involved through Altair contract as specialist Cylc consultant.
    215 === Inactive work packages
    216 
    217205=== TIAV: Data processing and visualisation
    218206
     
    261249
    262250 * [https://code.metoffice.gov.uk/trac/TI/wiki/TIDS MOSRS TIDS link]
    263  * WP leads: Jin Lee, Fiona Smith
    264  * BoM contacts and contributors: Jin Lee, Fiona Smith
    265251 * CSIRO contacts and contributors: Martin Dix
    266252
     
    279265 * [wiki:UMTIPBoMTagPlanning BoM TAG Planning pages]
    280266
    281 
    282267== Partnership Work Plan document links
    283268