Changes between Version 92 and Version 93 of access/UmPartnersTechnicalInfrastructureProject


Ignore:
Timestamp:
Feb 18, 2019 6:34:03 PM (6 months ago)
Author:
Michael Naughton
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • access/UmPartnersTechnicalInfrastructureProject

    v92 v93  
    128128
    129129 * [https://code.metoffice.gov.uk/trac/TI/wiki/TIDS MOSRS TIDS link]
    130  * WP leads: Jin Lee, Fiona Smith
    131  * BoM contacts and contributors: Jin Lee, Fiona Smith
     130 * WP leads: Fiona Smith, Douglas Boyd
     131 * BoM contacts and contributors: Fiona Smith
     132 * Currently reviewing options for having this work package as a separate activity, or addressing data sharing issues through other avenues.
    132133 * BoM FTE's: 0.2 (CD: 0.1; LI: 0.1)
    133    * CD: Identify files to be added to Jasmin data server; maintain Bureau TIDS mirror. (0.1)
    134    * LI: Maintain Bureau mirroring of MOSRS repositories and Bureau ACCESS TRAC systems. (0.1)
    135    * Jin Lee, Jonathan Thomas, Asri Sulaiman to be primary Bureau contact points for Jasmin and BoM MOSRS mirrors.
    136134 * CSIRO contacts and contributors: Martin Dix
    137135 * ARCCSS/CLEX contacts and contributors: Scott Wales
     
    143141 * BoM contacts and contributors: Ilia Bermous, Milton Woods, Justin Freeman.
    144142 * NCI contacts and contributors: Ben Evans, Dale Roberts, Rui Yang (ACCESS-Opt project).
    145  * BoM FTE's: BoM 0.3 (CD: 0.1, LI: 0.2)
    146   * CD: Contribute Bureau / ACCESS-Opt developments to UM partnership. (0.1)
    147   * LI: Implement and test latest MO optimisations in ACCESS models. (0.2)
    148   * CD: Collaborate on benchmark development, testing, sharing. (0.0)
    149   * OpenMP coverage improvement if something significant is found in the latest sources.
    150   * Performance improvements in handling transcendental functions.
    151   * Tune building procedure with the Intel compiler for !Raijin/Terra/Australis.
    152   * Performance tuning of UM models for the APS3 operational upgrade.
    153   * Investigate performance of the most expensive loops.
    154   * See [https://code.metoffice.gov.uk/trac/TI/wiki/TIHP#ACCESSHPCOptimisationandrelatedlinks ACCESS section in MOSRS TIHP page].
    155 
    156 === TIPP: IMPROVER -- NWP probabilistic post-processing ansd supporting verification
     143 * Now covered within TICT work package above.
     144 * BoM FTE's: BoM 0.0
     145
     146=== TIPP: IMPROVER -- NWP probabilistic post-processing and supporting verification
    157147
    158148 * [https://code.metoffice.gov.uk/trac/TI/wiki/TIPP MOSRS TIPP link]
     
    202192 * ACCESS contacts and contributors: Peter Steinle, Greg Kociuba, Nathan Eizenberg
    203193 * BoM FTE's: 0.2 (CD: 0.1; LI: 0.1)
    204    * Development and delivery of reanalysis suite in roses-u; extending UERRA suite with local configuration and tools
     194   * BARRA Bureau Australian Region Reanalysis project.
    205195   * Reanalysis production run over the Australian domain for period 2000-2016, and report regional evaluation results for comparisons with other regional reanalysis projects.
    206    * Report to TAG summarising progress and capability.
    207    * Aligned with Bureau Reanalysis project.
     196   * BoM and NIWA have joint interest, iother UM Partners may also have interest, benefit from this activity.
    208197
    209198=== TIOP: Operational Systems
     
    211200 * WP lead: Tennessee Leeuwenburg
    212201 * BoM Cylc project contact and contributors: Alan Riley, Damian Agius, Hilary Oliver (NIWA)
    213  * BoM FTE's: 0.2 (CD: 0.2; LI: 0.0)
     202 * This nominal project was proposed to capture BoM activities to for Cylc assurance and enhancements for BoM operational requirements.  This will now be better to communicate through TIRS project. 
     203 * BoM FTE's: 0.0
     204
     205
     206
    214207   * CD: Bureau to take lead on security enhancement of UM TI components. (0.1)
    215208   * CD: Bureau to participate in discussions and meetings on operational technical infratructure aspects. (0.1)