wiki:access/UMTIPBoMWorkingTable

Version 23 (modified by Michael Naughton, 6 months ago) (diff)

--

UM Partnership Technical Infrastructure Collaboration Project -- BoM Contribution Working Table

Revision status

[Michael Naughton 05/02/2018] Work in progress: This page is currently being updated for 2018-19 plans. Information below is subject to change.

2018-19 BoM Contribution Working Table

Bureau contributions for each work package, and division into Consortium Development (CD) and Local Implementation (LI) components. Notes below will record material differences between these plans and figures in UMTIP Project plan docs maintained by Met Office UMTIP Project Manager.

2018-19 Bureau contributions

WP WP description BoM CD LI Notes
Primary Work Packages
TIAG Advisory Group 0.2 0.1 0.1
TIAN Ancillaries 0.2 0.1 0.1 ANTS
TICT UM Configuration Testing 0.2 0.1 0.1
TIDA Data Assimilation 1.1 0.9 0.2 Obs Capability
TISD Suite Design 0.4 0.2 0.2 Portable suites, Suite docs
TIEX Exascale-LFRic TBD TBD TBD Feb LFric workshop
Primary WP Sub-total 2.1 1.4 0.7
Secondary Work Packages
TIAV IRIS -- Diagnostics & visualisation 0.1 0.1 MDS & Improver
TIDS Collaborative data sharing 0.2 0.1 0.1 JASMIN/MASS/MOSRS
TIHP HPC Optimisation & Benchmarking 0.3 0.1 0.2 Sub-group of TICT
TILI Land-surface data assimilation LIS
TILS Land-surface model schemes Jules/CABLE
TIVE Verification 0.2 0.2 VER, RMED Toolbox
Secondary WP Sub-total 0.8 0.3 0.5
Other TI Collaboration Activities
TIRA Reanalysis 0.2 0.1 0.1
TIOP Operational systems 0.2 0.2 Incl. BoM-Altair Cylc Project
Other TI Collab Sub-total 0.4 0.3 0.1
Total 3.3 2.0 1.3

Previous versions of this page