UM Partnership Technical Infrastructure Collaboration Project -- BoM Contribution Working Table
Revision status
- [Michael Naughton 11/05/2020] Work in progress: This page is being updated with draft version of BoM 2020-21 plans. 2019-20 and other previous years plans are at link below.
2020-21 BoM Contribution Working Table
Bureau contributions for each work package, and division into Collaboration Development (CD) and Local Implementation (LI) components. Notes below will record material differences between these plans and figures in UMTIP Project plan docs maintained by Met Office UMTIP Project Manager.
2019-20 Bureau contributions
WP | WP description | BoM | CD | LI | Notes |
Primary Work Packages | |||||
TIAG | Advisory Group | 0.2 | 0.1 | 0.1 | |
TIDA | Data Assimilation | 1.1 | 0.9 | 0.2 | Obs Capability |
TISD | Suite Design | 0.4 | 0.2 | 0.2 | Portable suites, Suite docs |
TIRS | Rose-Cylc Development | 1.0 | 0.5 | 0.5 | Cylc-8 Development |
TING | Next-Gen Modelling System | 0.9 | 0.9 | 0.0 | 0.5 subject to gaining funding |
TIAN | Ancillaries | 0.3 | 0.2 | 0.1 | ANTS: figs from last year |
TICT | UM Configuration Testing | 0.3 | 0.2 | 0.1 | UM model Partner Development Group |
Primary WP Sub-total | 4.2 | 3.0 | 1.2 | ||
Other TI Collab | |||||
TIPP | Improver Post-processing & Verification | 9.0 | 2.0 | 7.0 | Currently only BoM-MO collaboration |
TIVE | Verification | 0.5 | 0.3 | 0.2 | GES/RES, METplus |
TILI | Land-surface data assimilation | 0.0 | 0.0 | LIS | |
Other TI Collab Sub-total | 9.5 | 2.3 | 7.2 | ||
Total | 13.7 | 5.3 | 8.4 |
Previous versions of this page
- BoM 2019-20 Contributions Work Table (Feb 2019)
- BoM 2018-19 Contributions Work Table (Feb 2018)
- BoM 2017-18 Contributions Work Table (Jun 2017)
- BoM 2016-17 Contributions Work Table (Apr 2016)
Links
- Back to ACCESS wiki main page
- Back to ACCESS UMTIP main page
Last modified 3 years ago
Last modified on May 13, 2020 12:28:28 PM