Summary Requirements and Progress
(Meeting 21/09/2015)
1. Install UK Global suite, which covers both APS3-G and APS3-Ensemble systems

  • Based on PS36-G -> our initial Baseline APS3-G
  • Done with UK's inputs by DA team members

2. Further local development

  • Add observation related tasks Extract & save obs bufr files -> Create ODB -> Process Obs with OPS

in OPS rose stem and APS3-G. Use https://accessdev.nci.org.au/trac/ticket/213 to record progress
DA team is expected to lead in this activity, MST participation

  • Cold Start from UKIC
  • SURF inputs from BOM (Will discuss with Imtiaz)
  • Add tasks for post processing, archiving, monitoring, verification, Charts Using tools from the Utility WG
  • Joint implementation by DA and GE members
  • Design and Implementation review: Xiao & BNOC



Attachments (1)

Summary_G3_update.pptx (101.1 KB) - added by Yi Xiao 3 years ago.

Download all attachments as: .zip

Change History (13)

comment:1 Changed 3 years ago by Yi Xiao

Keywords: SWG added

G3 & GE Suite development Progress (Please Include Data source if necessary)


(30/09/2015) Merge u-aa116 into u-aa459: Susan (estimate 1 week)
(06/10/2015) merge u-aa116 into newly available u-aa669 (PS37 research trial suite) (1 week)
Almost done by Susan (14/10/2015). Done now (29/10/2015)

  • a starting point is to copy u-aa669 to u-aa670.
  • SITE="nci"
  • Use optional configuration for nci specifics
  1. Cold Start (Jin & Susan etc). Use inputs from BOM
    • Currently using inputs from UK archive, including control files provided by UK for the trial period.
    • Discussed using UKIC at cold start. We will come back to this later.
  2. Create Bufr and ODB: (Tan, Susan, Jin, Fabrizio, Xiao)
    • Create Bufr is done: including using BNOC's bufr archiving and additional MARS retrieval
      where are bufr files are archived?
    • Substantial progress has been made on ODB creation.
      • All satellite obs should work (except for those disabled by OPS, CrIS is being tested): Tan & Xiao in OPS
      • Surface, Aircraft, Sonde are working. AMV is being checked (Create ODB is OK, but ODB is incorrect 29/10/2015): Tan in OPS
  3. Process Obs: Fabrizio, Jin, Susan, Xiao (early stages)
    • Should not have problem for types mentioned in 2 above.
    • Use optional configurations to allow for larger bufrbufrsize.
  4. VAR : Susan has tested in G suite.
    • (29/10/2015) N320 VAR task hung Action: Ilia to have a look.
  5. SURF: Susan and Imtiaz have done some.
    • Currently using sst and sea ice from UK archive.
    • Discussed using BOM inputs: such as sst and sea ice. Will work on this later.
    • ASCAT archiving is in ISS's hand now.
  6. Trimobs and ETKF: GEWG + Xiao based on updated u-aa670
  7. ENGL: recon & fcst: GEWG + Xiao based on updated u-aa670
    • GE WG have started to work on GE3 tasks now.
  8. Archive (Um and ODB):
    • Opendap (Tan lead?).
    • mdss Archive (Susan?)
    • ODB2 archive (Jin?)
  9. Verfication (vs an and vs obs):
    • The suite WG to provide requirements (including timeline) and interface design to the UWG)
    • Against analysis ( Chris? )
    • Against obs (Susan? for surface. sonde Xiao?)
  10. Charts: Wenming lead?
  11. Monitoring (obs and UM and VAR ): who?
  12. Optimization : Ilia with Support from Xiao
  13. UM: Ashley, Ilia, Xiao, Lawrie
  14. Review: Xiao with BNOC
  15. Ancillary : Greg with support from Martin
Last edited 3 years ago by Yi Xiao (previous) (diff)

comment:2 Changed 3 years ago by Yi Xiao

Cc: Yi Xiao Asri Sulaiman Fabrizio Baordo Gary Dietachmayer Imtiaz Dharssi Jin Lee Michael Naughton Peter Steinle Susan Rennie David Smith added

comment:3 Changed 3 years ago by Peter Steinle

Last edited 3 years ago by Peter Steinle (previous) (diff)

comment:4 Changed 3 years ago by Peter Steinle

Last edited 3 years ago by Peter Steinle (previous) (diff)

comment:5 Changed 3 years ago by Yi Xiao

cc listed people,
I break the Suite into a few group of tasks.
could you please review the list, and put your name against the 10 groups, or a modified version?
so that we know that the tasks are attended to, and how we travel along. Thanks, Xiao

comment:6 Changed 3 years ago by Susan Rennie

A partial list from what I'm aware of, for G.

  1. Cold start. Jin (and Susan et al.)
  2. Create Bufr and ODB. Fabrizio, Jin, Susan, Tan
  3. Process Obs. Fabrizio, Jin, Susan (early stages)
  4. VAR. Susan has tested in G suite.
  5. SURF. Susan/Imtiaz have done some.

Changed 3 years ago by Yi Xiao

Attachment: Summary_G3_update.pptx added

comment:7 Changed 3 years ago by Yi Xiao

Cc: Yi Xiao Asri Sulaiman Fabrizio Baordo Gary Dietachmayer Imtiaz Dharssi Jin Lee Michael Naughton Peter Steinle Susan Rennie David Smith removed

comment:8 Changed 3 years ago by Yi Xiao

Cc: Yi Xiao Asri Sulaiman Fabrizio Baordo Gary Dietachmayer Imtiaz Dharssi Jin Lee Michael Naughton Peter Steinle Susan Rennie David Smith Zhihong Li Xudong Sun Wenming Lu Tan Le Tomasz Glowacki Chris Tingwell added

comment:9 Changed 3 years ago by Peter Steinle

Last edited 3 years ago by Peter Steinle (previous) (diff)

comment:10 Changed 3 years ago by Michael Naughton

Note that detailed documentation of the roses-u APS3 G & GE suites development is in MOSRS roses trac system, in https://code.metoffice.gov.uk/trac/roses-u/ticket/1 and references therein.

comment:11 Changed 3 years ago by Michael Naughton

Keywords: APS3 added

comment:12 Changed 3 years ago by Michael Naughton

Owner: set to Yi Xiao
Status: newassigned